The new indoor arena will be 100′ X 220′ Britespan hoop building, built by Freedom Builders. The building will have rollup curtains along the long sides that can be rolled up in the summer, LED lighting and public address system for clinics. The footings have been laid and have to cure for 10 days. Monday October 28th will be time to start the building. we have spent the last week putting the footing down (limestone base) thanks to Gary Crews Enterprise trucking. Over 300 tons and more is needed.